Thursday, May 26, 2011

QTP Life Cycle

       

QTP life cycle contains six phases

Ø  Test planning
Ø  Generating the basic test
Ø  Enhancing the test
Ø  Debugging the test
Ø  Executing the test
Ø  Analysis the Results

Test Planning:
In this phase the automation test lead will do the following
Ø  Understanding the requirements
Ø  Identifying all the areas to be automated
Ø  Analyzing both the negative and positive flow of the application
Ø  Preparing the automation test plan document based on the analysis
Ø  Preparing the tool ready with all the pre configurationally settings for the further operations.

Generating the basic test:
In this phase the automation test engineer will generate the basic test engineer will generate the basic test for both the +ve and –ve flow of the application

Enhancing the Test:

One can enhance the script in the following ways

Ø  Adding comments
Ø  Inserting the script statement manually
Ø  Inserting the programmatic statements

Ø  Inserting the check points

Ø  Parameterizing the test
Ø  Inserting the output value statements
Ø  Synchronizing the test
Ø  Inserting the transactional points for measuring transactions

No comments:

Post a Comment